Solutions / MRP Suite

Plan. Produce. Cost for real.

Manufacturing, quality, and budgets share Items and recipes — so WIP, QC lots, and margins stay honest with inventory.

  • Recipe & BOM spine
  • QC on real lots
  • Cost before you commit

A connected manufacturing loop.

Plan → procure context → produce → inspect → stock → analyze.

Plan

Produce

Inspect

Stock

Analyze

Why MRP Suite

Production decisions against live materials.

01

One recipe spine

Routes, batches, and packing share the same BOM as inventory.

02

QC tied to source lots

Checks link to GRN/production — not orphan checklists.

03

Margin before you sell

Recipe costing and target-margin gates before price commitment.

What manufacturers need

Floor visibility that finance can trust.

Greater control. Higher efficiency. Clearer cost.

Production overview

Batch and WIP metrics while the shift is still running.

Recipes, routes, schedule

From BOM to capacity schedule and packing.

Lot QC statuses

Pass / pending / not-passed against definitions by item.

Recipe costing

Cost basis and can-sell checks before you quote.

Machine PM

Preventive maintenance schedules and work orders.

Raw → unfinished → finished

Stock stages that sales can actually promise from.

Included miniapps

Produce with the same truth as ERP.

Manufacturing

  • Recipes, routes, batches, packing
  • Planning and capacity schedule
  • Machines, PM, labour tracking

Quality

  • QC definitions by item/group
  • Checks linked to GRN/production lots
  • Pass, pending, and work-order views

Budgets

  • Plans with periods and status
  • Recipe costing and margin gates
  • Overview next to production reality

BOM

Shared recipe spine

Lots

QC on source txns

Margin

Cost before you sell

PM

Machine maintenance

Ready to connect the floor?

Produce, inspect, and cost on one spine.